• Log in or sign up for an account here: https://www.sythe.org/login

Resolved

Status
Not open for further replies.
Joined
Aug 16, 2011
Sythe Gold
38,252
Messages
35,837
<3 n4n0
Extreme Homosex
Potamus
Profile link: https://www.sythe.org/members/theglacier-com.1517414/
Amount : Unfinished work
Discord ID + Unique Discord ID: 893433330664624138 | glacier147
Proof that it's their Discord: Screen capture - 7570bf80986fadeaa4adc61f08d92cee - Gyazo

Explanation of the trade: We had agreed on a TOB package order on the 15th of April. He said the order will be finished within 3-4 bonds. 1.5 months according to @TheGlacier.com. This however was not fulfilled as promised. In May things started changing. His communication got worse and he would constantly give me promises to receive an update and it would take days before he would actually provide said update. The progress took a nose dive and the client has been very frustrated (and understandably so) and it was quite hard to get any info from Glacier on what is happening. It wasn't until the 17th (2 months and 2 days after the job was assigned) that I had to reassign it because the work progress showed no improvement and it was quite hard getting a hold of glacier if at all.
How they scammed: Unfinished work, failed promises.
Other relevant trade screenshots:

* Timeframe that was agreed upon - Screenshot - 3b509bbbcf7aae675d3912297367ed56 - Gyazo
* One month after the job was assigned, things started going down hill. He said all levels are done only the elite void requirements left on the 17th of May. Also on the 22nd of May I find out only one level of thieving has been gained in 5 days - Screenshot - b3fce46c4954ac0e1a613833c8c028a7 - Gyazo
* 22nd May, took him 4 days to send screenshots. He also said here that he will finish within 16 days (1 bond) - Screenshot - 809c2735a24f8efe4fe387c2c6001bbc - Gyazo
* More than a week passes by, he gained 69-70 mining and 15-68 thieving. That is as slow as you can get. I also warned him that if he doesn't improve in the next three days, the job will be reassigned. I didn't get a hold of him at all at this point. I was getting worried and was ready to reassign the job - Screenshot - cad107eebd47c50dca557da1b6a84b21 - Gyazo | Screenshot - 0059bd429008eea094d7d73bcdc45aa3 - Gyazo
* 6th of May he says he wants another 14 days to finish it. I msg him again on the 13th and I don't hear anything. It wasn't until the 15th that I get an answer - Screenshot - 200de20e3c053f9a1ed038e7aa7dbd6b - Gyazo
* Our last interaction - Screenshot - 8a8a2c7f9784c87f56accdcaa6cdd450 - Gyazo
* These were the stats when the customer changed his passwords awaiting reassignments to a different worker - Screenshot - 5f071b876c50d436206d78c0dda3cc7a - Gyazo

*** TOS that was agreed upon : Screenshot - 6e1b35786ce3572428f0a4f9751fe538 - Gyazo

My manager also checked the accounts and there loads of quests, skills and requirements missing and far from being done.

Today he messaged me and asked for his payment. In my opinion he is not entitled to any compensation for not fulfilling the work within the agreed time. All the screenshots show the poor progress he's made and there was no signs of him of finishing the job any time soon.
Just the icing on the cake, it took him 4-5 days to realize he was kicked out of the server and the passwords were changed. This + the fact that the client reported that the last login on the accounts was "2 days ago" when he changed the passwords shows that he had no intention of finishing this anytime soon. Screenshot - 9e4b97a478676292d02a22acfd1f2ce9 - Gyazo

With all the evidence provided, is he entitled to any form of compensation? Looking for a staff member to settle this as I believe he broke the TOS and other agreements that were made which does not entitle him to any payment.
 
Hey everyone, I hope everyone is doing well. First of all I would like to start by saying that he said that the account will not be logged in for two days.
This was the reason
d3ebe1e1a2ec09889dc47813e42101b7.jpg

If I were in the channel, I could show you how he tried to force me I do this work and after listening to his prices, I didn't do his job and he threatened me that I would kick you out of the server if you didn't do it. I didn't even reply to him for about 5/6 days because I didn't want this account
If he thinks about it, he will realize that the 3/4 memberships I mentioned were regular void, but not elite void .
e3d91cd49c79cbdf75a376074f5b5af8.jpg

When I completed his other levels, I told him that elite void will not be done by me, regular void I will do it to you. So he forced me and raised the price too, if you build it as soon as possible I will pay you more. I was celebrating eid and back then they changed password and almost elite void requirements were about to be completed.
Own use gold & membership I was trying my best and his term condition was also 2023. Earlier he used to give me accounts and sent tos again saying whether you are agree or not, this time he didn't do that either. It should pay me according to my work as much.
I hope you all understand (Thanks)
 
<3 n4n0
Extreme Homosex
Potamus
Hey everyone, I hope everyone is doing well. First of all I would like to start by saying that he said that the account will not be logged in for two days.
This was the reason
d3ebe1e1a2ec09889dc47813e42101b7.jpg

If I were in the channel, I could show you how he tried to force me I do this work and after listening to his prices, I didn't do his job and he threatened me that I would kick you out of the server if you didn't do it. I didn't even reply to him for about 5/6 days because I didn't want this account
If he thinks about it, he will realize that the 3/4 memberships I mentioned were regular void, but not elite void .
e3d91cd49c79cbdf75a376074f5b5af8.jpg

When I completed his other levels, I told him that elite void will not be done by me, regular void I will do it to you. So he forced me and raised the price too, if you build it as soon as possible I will pay you more. I was celebrating eid and back then they changed password and almost elite void requirements were about to be completed.
Own use gold & membership I was trying my best and his term condition was also 2023. Earlier he used to give me accounts and sent tos again saying whether you are agree or not, this time he didn't do that either. It should pay me according to my work as much.
I hope you all understand (Thanks)

Oh boy, we're starting off with lies... okay...

When I first learned about the interest in TOB accounts, I informed him and I said ELITE void, he said he was interested and we were negotiating a price afterwards. Screenshot - 3269dddff8fbcac1d95066bed16daed9 - Gyazo
He further confirms how long it will take as by my original post - Screenshot - c7bc676ff7762076a3e01d374ccf9812 - Gyazo
Me telling him that the accounts must have ELITE void, him acknowledging it - Screenshot - 3eeb25f9ea013b4a33438ff10f8b56c2 - Gyazo

The icing on the cake here is, I asked him after how much he would do REGULAR void for because I assumed its cheaper and quicker. He SPECIFICALLY turned down regular void and said "I do elite dear" - Screenshot - 854603fed4f22c7b25e1e2bb3cb4fb2d - Gyazo

When the client placed the order for elite void package, I asked him if he is interested in the order, no forcing whatsoever. I also reminded him several times that its ELITE VOID - Screenshot - b1d5942213606151404c6af9c01458df - Gyazo

It wasn't until nearly a month later where he started complaining about the requirements of elite void. What kind of professional builder doesn't know the requirements for the accounts he SPECIFICALLY asked for and starts complaining? I told him this afterwards. When he expressed frustration I offered added payment if we were to finish fast or at least within the agreed timeframe. I did NOT have to do this, but because I'm trying to make him and the client happy I offered more money nearly a month AFTER. - Screenshot - 6cca66211705b25f880d3b1c6c822983 - Gyazo
Now he starts getting dodgy and wants to change the order a MONTH after the job was assigned and wants to make it into regular void instead - Screenshot - b3c853fee5475f76127547e3403b6c7d - Gyazo


So, we've established that he's lazy, doesn't finish in time and unprofessional. Now we have established that he's a liar on multiple levels. :rolleyes:
 
Oh boy, we're starting off with lies... okay...

When I first learned about the interest in TOB accounts, I informed him and I said ELITE void, he said he was interested and we were negotiating a price afterwards. Screenshot - 3269dddff8fbcac1d95066bed16daed9 - Gyazo
He further confirms how long it will take as by my original post - Screenshot - c7bc676ff7762076a3e01d374ccf9812 - Gyazo
Me telling him that the accounts must have ELITE void, him acknowledging it - Screenshot - 3eeb25f9ea013b4a33438ff10f8b56c2 - Gyazo

The icing on the cake here is, I asked him after how much he would do REGULAR void for because I assumed its cheaper and quicker. He SPECIFICALLY turned down regular void and said "I do elite dear" - Screenshot - 854603fed4f22c7b25e1e2bb3cb4fb2d - Gyazo

When the client placed the order for elite void package, I asked him if he is interested in the order, no forcing whatsoever. I also reminded him several times that its ELITE VOID - Screenshot - b1d5942213606151404c6af9c01458df - Gyazo

It wasn't until nearly a month later where he started complaining about the requirements of elite void. What kind of professional builder doesn't know the requirements for the accounts he SPECIFICALLY asked for and starts complaining? I told him this afterwards. When he expressed frustration I offered added payment if we were to finish fast or at least within the agreed timeframe. I did NOT have to do this, but because I'm trying to make him and the client happy I offered more money nearly a month AFTER. - Screenshot - 6cca66211705b25f880d3b1c6c822983 - Gyazo
Now he starts getting dodgy and wants to change the order a MONTH after the job was assigned and wants to make it into regular void instead - Screenshot - b3c853fee5475f76127547e3403b6c7d - Gyazo


So, we've established that he's lazy, doesn't finish in time and unprofessional. Now we have established that he's a liar on multiple levels. :rolleyes:
Add me to the channel and I'll talk to you and Sythe staff with proof.
 
Cubone
Marowak
Kangaskhan
Pikachu
Charmander
Charmeleon
Charizard
Bulbasaur
Ivysaur
Venusaur
Pokémon Trainer
Poké Prizebox
Pokémon Master
Tier 1 Prizebox
Tier 2 Prizebox
Tier 3 Prizebox
Tier 4 Prizebox
Tier 5 Prizebox
Tier 6 Prizebox
Tier 7 Prizebox
Member of the Quarter Winner
Staff of the Quarter Winner
Sythe's 20th Anniversary
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Sythe Awards 2025 Winner
The Glizz
Baby Yoda
May the 4th Be With You
The Dark Side
Hello @Oracle - I have reviewed some key points in the worker Terms of Service agreed upon by you and @TheGlacier.com below;

SrIi6.png
  • Unfinished work won't be paid, you will be paid once the job is over.
While the job was unfinished at the time you reassigned it, there is nothing in the Terms of Service that states exactly when a job would be reassigned to another worker.

  • Provide regular updates
Regular updates is pretty vague and subjective here, and there is nothing stating what the outcome would be if 'regular updates' were not provided.


After discussing this with other Staff; @Oracle you may choose one of the following options;
 
<3 n4n0
Extreme Homosex
Potamus
Hello @Oracle - I have reviewed some key points in the worker Terms of Service agreed upon by you and @TheGlacier.com below;

SrIi6.png
  • Unfinished work won't be paid, you will be paid once the job is over.
While the job was unfinished at the time you reassigned it, there is nothing in the Terms of Service that states exactly when a job would be reassigned to another worker.

  • Provide regular updates
Regular updates is pretty vague and subjective here, and there is nothing stating what the outcome would be if 'regular updates' were not provided.


After discussing this with other Staff; @Oracle you may choose one of the following options;
Kind of silly that you're not even considering the fact that he promised a timeline on several occasions that was not fulfilled. How is that not breaking an agreement?

Furthermore, the guy is a proven liar yet you're simply choosing to ignore that. He promised a certain build within a specified timeline that he gave me and that hasn't been fulfilled on his end. Is that acceptable?
 
Hello @Oracle - I have reviewed some key points in the worker Terms of Service agreed upon by you and @TheGlacier.com below;

SrIi6.png
  • Unfinished work won't be paid, you will be paid once the job is over.
While the job was unfinished at the time you reassigned it, there is nothing in the Terms of Service that states exactly when a job would be reassigned to another worker.

  • Provide regular updates
Regular updates is pretty vague and subjective here, and there is nothing stating what the outcome would be if 'regular updates' were not provided.


After discussing this with other Staff; @Oracle you may choose one of the following options;
Elite Void Requirements
24024ac3a6ffbc20a6536699259763ef.jpg

Last Update
7bea86a8bb8b356e36cc0f99a6ff70c6.jpg

Left Stats
2 Levels Thieving
34 Levels Farming
31 Levels Construction
64 Levels Magic
 
Kind of silly that you're not even considering the fact that he promised a timeline on several occasions that was not fulfilled. How is that not breaking an agreement?

Furthermore, the guy is a proven liar yet you're simply choosing to ignore that. He promised a certain build within a specified timeline that he gave me and that hasn't been fulfilled on his end. Is that acceptable?
I already tell you add me in Channel I'll give you prove. And i already tell you i do first time Elite Void i don't have experience.
 
<3 n4n0
Extreme Homosex
Potamus
Hello @Oracle - I have reviewed some key points in the worker Terms of Service agreed upon by you and @TheGlacier.com below;

SrIi6.png
  • Unfinished work won't be paid, you will be paid once the job is over.
While the job was unfinished at the time you reassigned it, there is nothing in the Terms of Service that states exactly when a job would be reassigned to another worker.

  • Provide regular updates
Regular updates is pretty vague and subjective here, and there is nothing stating what the outcome would be if 'regular updates' were not provided.


After discussing this with other Staff; @Oracle you may choose one of the following options;
Just to have this in the official report and not just the discord.

The issue here is before I assigned him the job, he repeatedly advertised and described what the product will be AND what the timeframe is. He didn't say "maybe around 3-4 memberships" or "I don't know how long." He specified the parameters on more than one occasion BEFORE I assigned the job. So he was fully aware of what he was doing because he wanted the the job and he advertised it as such. "Elite void, within 3-4 memberships". Not ifs, not maybes. WITHIN. If he said this once we could dismiss it as unintentional, mistake or whatever. But he confirmed this over and over again until he got the job.

The product he delivered within 3-4 months is not what was described. No elite void, no regular void, bunch of skills and quests missing on all three accounts. This is simply false advertisement and isn't what I requested or what he promised.
 
Cubone
Marowak
Kangaskhan
Pikachu
Charmander
Charmeleon
Charizard
Bulbasaur
Ivysaur
Venusaur
Pokémon Trainer
Poké Prizebox
Pokémon Master
Tier 1 Prizebox
Tier 2 Prizebox
Tier 3 Prizebox
Tier 4 Prizebox
Tier 5 Prizebox
Tier 6 Prizebox
Tier 7 Prizebox
Member of the Quarter Winner
Staff of the Quarter Winner
Sythe's 20th Anniversary
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Sythe Awards 2025 Winner
The Glizz
Baby Yoda
May the 4th Be With You
The Dark Side
Kind of silly that you're not even considering the fact that he promised a timeline on several occasions that was not fulfilled. How is that not breaking an agreement?

Furthermore, the guy is a proven liar yet you're simply choosing to ignore that. He promised a certain build within a specified timeline that he gave me and that hasn't been fulfilled on his end. Is that acceptable?


While you are correct that @TheGlacier.com did state that he could do the job in 3-4 memberships, there is nothing in writing that states what would occur if the job went over that timeline, so that leaves us with your original worker's Terms of Service to refer to, which has been noted in my post above and the decision was made based on that.
 
While you are correct that @TheGlacier.com did state that he could do the job in 3-4 memberships, there is nothing in writing that states what would occur if the job went over that timeline, so that leaves us with your original worker's Terms of Service to refer to, which has been noted in my post above and the decision was made based on that.
Can you tell him to add me to the channel? Only for 10 Minutes
 
Last edited:
<3 n4n0
Extreme Homosex
Potamus
While you are correct that @TheGlacier.com did state that he could do the job in 3-4 memberships, there is nothing in writing that states what would occur if the job went over that timeline, so that leaves us with your original worker's Terms of Service to refer to, which has been noted in my post above and the decision was made based on that.
I think you're setting a very dangerous precedent. It is common sense that if a product isn't delivered as described then it is false advertisement. What would've happened here if I paid him in advance and he did not deliver the job as promised? He'd be required to provide a refund as it isn't as described. You know this and every other member in here knows this.
You're also not making any comments on the fact that he lied in this report on several occasions and there has been no repercussions or as little as acknowledging the fact that he lied.


In order for me to agree on one or the other, I need an answer on the following:
- If I'm going to let him finish the job, how much more is it going to take? Because we're past 3-4 membership now.
- If I go with option 2, how much should I be compensating him? The agreed amount was [REDACTED] for each account for a total of [REDACTED]. I offered to increase the price to [REDACTED] while the job was in progress on the grounds that he finish it fast and at least within the agreed timeframe which has now been passed.

He has also lied AGAIN on what is left to do on the accounts in his last post.

The agreed description of the job:
7b75b42ef6c57c99f607d41aaf42b1ac.png

What is actually missing as reported by my manager:
Account 1 & 2 (note: He completed lost city on account 2)-
Quests:
• Priest In Peril • Lost City • Big Chompy Bird Hunting • Rune Mysteries • The Grand Tree • Monkey Madness 1 • Eagles' Peak • Roving Elves • Swan Song • Regicide • Underground Pass • Biohazard • Plague City • Holy Grail • One Small Favour • Murder Mystery • Black Knights' Fortress • King'S Ransom • Merlin'S Crystal • Shilo Village • Sheep Herder • Druidic Ritual • the eye of glouphrie
Skills:
smithing 1-30, herblore 3-18, fletching 1-20, construction 1-65, farming 1-68, thieving 74-75, magic 1-64
Other requirements:
1650 void points (even regular void wasn't completed), Nothing > Dragon defender, Fire cape. Easy, Medium & Hard Western requirements.

Account 3 -
Quests:

• Priest In Peril • Big Chompy Bird Hunting • Rune Mysteries • The Grand Tree • Monkey Madness 1 • Eagles' Peak • Roving Elves • Swan Song • Regicide • Underground Pass • Biohazard • Plague City • Holy Grail • One Small Favour • Murder Mystery • Black Knights' Fortress • King'S Ransom • Merlin'S Crystal • Shilo Village • Sheep Herder • Druidic Ritual • Desert Treasure • Temple Of Ikov • Troll Stronghold • Death Plateau • The Tourist Trap • The Dig Site • The eye of glouphrie
Skills:
smithing 1-30, herblore 3-18, fletching 1-20, construction 34-65, farming 34-68, magic 1-95, slayer 9-10
Other requirements:
1650 void points, Nothing > Dragon defender, Fire cape, MA2 cape. Easy, Medium & Hard Western requirements.

Side note - Paying for these requirements individually will cost me more than the package price agreed with Glacier. Just wanted to mention this.
 
Last edited:
Cubone
Marowak
Kangaskhan
Pikachu
Charmander
Charmeleon
Charizard
Bulbasaur
Ivysaur
Venusaur
Pokémon Trainer
Poké Prizebox
Pokémon Master
Tier 1 Prizebox
Tier 2 Prizebox
Tier 3 Prizebox
Tier 4 Prizebox
Tier 5 Prizebox
Tier 6 Prizebox
Tier 7 Prizebox
Member of the Quarter Winner
Staff of the Quarter Winner
Sythe's 20th Anniversary
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Sythe Awards 2025 Winner
The Glizz
Baby Yoda
May the 4th Be With You
The Dark Side
I think you're setting a very dangerous precedent. It is common sense that if a product isn't delivered as described then it is false advertisement. What would've happened here if I paid him in advance and he did not deliver the job as promised? He'd be required to provide a refund as it isn't as described. You know this and every other member in here knows this.
I can only make a decision based on the terms of service you provided here.
  • "Unfinished work will not be paid, you will be paid once the job is over"
  • "Provide regular updates"
1) The worker was still working on the account at the time it was reassigned, and there is nothing in your terms of service or the conversation in which the worker states 3-4 memberships for completion, that states what would happen if the job were to go over the deadline.


You're also not making any comments on the fact that he lied in this report on several occasions and there has been no repercussions or as little as acknowledging the fact that he lied.

@TheGlacier.com did not meet the deadline that he provided and did in fact lie about the stats on the account being completed on 5/17/2024.

Regarding this, @TheGlacier.com has been issued a TWC (Trade With Caution) for poor trading practices.


In order for me to agree on one or the other, I need an answer on the following:
- If I'm going to let him finish the job, how much more is it going to take? Because we're past 3-4 membership now.
- If I go with option 2, how much should I be compensating him? The agreed amount was [REDACTED] for each account for a total of [REDACTED]. I offered to increase the price to [REDACTED] while the job was in progress on the grounds that he finish it fast and at least within the agreed timeframe which has now been passed.

You are free to negotiate these terms with @TheGlacier.com. If you are unable to come to an agreement together then Staff can step in here.
 
<3 n4n0
Extreme Homosex
Potamus
I can only make a decision based on the terms of service you provided here.
  • "Unfinished work will not be paid, you will be paid once the job is over"
  • "Provide regular updates"
1) The worker was still working on the account at the time it was reassigned, and there is nothing in your terms of service or the conversation in which the worker states 3-4 memberships for completion, that states what would happen if the job were to go over the deadline.




@TheGlacier.com did not meet the deadline that he provided and did in fact lie about the stats on the account being completed on 5/17/2024.

Regarding this, @TheGlacier.com has been issued a TWC (Trade With Caution) for poor trading practices.




You are free to negotiate these terms with @TheGlacier.com. If you are unable to come to an agreement together then Staff can step in here.

You're the one who put these options on the table without more information on what each entails. I need to know my options before I decide.
 
Cubone
Marowak
Kangaskhan
Pikachu
Charmander
Charmeleon
Charizard
Bulbasaur
Ivysaur
Venusaur
Pokémon Trainer
Poké Prizebox
Pokémon Master
Tier 1 Prizebox
Tier 2 Prizebox
Tier 3 Prizebox
Tier 4 Prizebox
Tier 5 Prizebox
Tier 6 Prizebox
Tier 7 Prizebox
Member of the Quarter Winner
Staff of the Quarter Winner
Sythe's 20th Anniversary
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Sythe Awards 2025 Winner
The Glizz
Baby Yoda
May the 4th Be With You
The Dark Side
You're the one who put these options on the table without more information on what each entails. I need to know my options before I decide.

Your options are to let him finish the job or negotiate an agreement with him for compensation for the work he has completed on the accounts.
 
<3 n4n0
Extreme Homosex
Potamus
Your options are to let him finish the job or negotiate an agreement with him for compensation for the work he has completed on the accounts.
I mean this guy has to be trolling. This is a joke. I tried to negotiate with him on completing the accounts as that is the simplest and most straightforward thing.

ea5f14d16e65f2e9e60201077335e9ab.png



He wants 50 MORE DAYS to complete the job that he REPEATEDLY said will take 3-4 memberships initially.

And just a reminder, part of our last conversation (6th June) he said he needs 14 more days. Now he wants 50 more days. 50....EDIT: Forgot the screenshot

d474d98831c1a490bd351d5e5527bf23.png


He clearly does not want to complete this job. Are we just going to let this joke continue?
 
Last edited:
Cubone
Marowak
Kangaskhan
Pikachu
Charmander
Charmeleon
Charizard
Bulbasaur
Ivysaur
Venusaur
Pokémon Trainer
Poké Prizebox
Pokémon Master
Tier 1 Prizebox
Tier 2 Prizebox
Tier 3 Prizebox
Tier 4 Prizebox
Tier 5 Prizebox
Tier 6 Prizebox
Tier 7 Prizebox
Member of the Quarter Winner
Staff of the Quarter Winner
Sythe's 20th Anniversary
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Sythe Awards 2025 Winner
The Glizz
Baby Yoda
May the 4th Be With You
The Dark Side
@TheGlacier.com @Oracle
Are you able to come to an agreement on compensation for the work that has been completed?


If not, @Oracle can you please provide the uncensored conversations of the agreement on the package price?

How to make a post report with sensitive information:

Once you have created the thread using the following guidelines
You can then proceed to click on the report button located in the top right corner of the thread, which is highlighted in black in the image below:
5f50434693acdcbae718f1fd83e38212.png

Once you've clicked the report button, a text field will appear. Simply enter the information in the text field. An example is shown below:
19a59281635c11a14d379b23557ed441.png

Note: When using this method, any images must be hosted on either Gyazo · Screen Recorder: Share Screenshots and Videos Easily or Imgur: The magic of the Internet since direct image uploads into the text field are not supported

How to make a deleted post with sensitive information:

Once you have created the thread using the following guidelines
You should then scroll down to the bottom of the thread and input the information into the text field to make the post.
5caef887bda0857d78f8bc66bc937753.png

After clicking the "Post Reply" button and making the post, go straight to the top right of the post and click the "Delete" button (highlighted in the black box in the image below).

Please note: that you can add images to the text field above by following our guide found here: How to Upload Images to Sythe
98775ad840033c316bd94eb07d463fff.png


Once you have clicked the button, a text field will appear. Simply enter "sensitive information for staff to see," and then click the "Delete Post" button. A picture is provided below, with the button highlighted in black:
67d14c07385de1334a8427e3494e1a3c.png
 
<3 n4n0
Extreme Homosex
Potamus
@TheGlacier.com @Oracle
Are you able to come to an agreement on compensation for the work that has been completed?


If not, @Oracle can you please provide the uncensored conversations of the agreement on the package price?
An agreement for compensation has been reached. I'll be sending over the money tonight.


As closing words, I think it is pretty dangerous and its very concerning that we let people break WRITTEN agreements and lie on reports on numerous occasions and staff won't acknowledge this or weigh any of the evidence involved before making a decision just because the TOS didn't outline consequences for pretty common sense shit.
 
Status
Not open for further replies.
Runescape Gamblingrunescape gambling
Back
Top