Need 50-85 Construction

supplies u mean mahoganny planks or oak?
can do this easily with 2 or 3 days

25m 07

Meaning how much supplies in either oaks or mahogany , and if i do one or the other does it become cheaper? etc
 
Sythe Awards 2022 Winner
Sythe Awards 2023 Winner
Sythe Awards 2024 Winner
Member of the Month Winner
Dragon Claws
Battleship Champion
March Madness
Sythe's 20th Anniversary
Verified Diamond
WoW Classic
Summer 2025
Carrot
HamSanta
Halloween 2023
St. Patrick's Day 2024
Christmas 2023
Valentine's Day 2024
Top Striker
St. Patrick's Day 2025
Valentine's Day 2025
Staff of the Quarter Winner
The Dark Side
Tier 1 Prizebox
Tier 2 Prizebox
Easter 2026
May the 4th Be With You
Summer 2026
Easter 2025
Valentine's Day 2026
Sythe's 15th Anniversary
50-52 using oak planks should cost 180k then u can do mahoganny tables to 85 which will cost 49m or u can do oaks to 85 for 25.7m but will take longer (this is without the cost of the butler btw)

if u do mahogs service will probably be cheaper for sure
 
50-52 using oak planks should cost 180k then u can do mahoganny tables to 85 which will cost 49m or u can do oaks to 85 for 25.7m but will take longer (this is without the cost of the butler btw)

if u do mahogs service will probably be cheaper for sure

so how many mahogs i would need for it?
 
If you're using mahogany planks, I'd be able to do the service provided that you provide the supplies.

Cost: 24m 07 and I could give you a 1-2 day timeline.

Please let me know if you're interested.
 
Can do it for 25m, make sure you have demon butler, pm me on skype.
 
Last edited:
Mage, pm me on skype if you wanna discuss details, I can even make your maxed house once the order is complete.
 
Runescape Gamblingrunescape gambling
Back
Top