RS_WHISKEY
The sweeet burn of Old. No 7
- Joined
- May 26, 2015
- Sythe Gold
- 294
- Messages
- 628
I need 42-70 construction done. I need a quote for materials and labor. Message me directly on here or through skype in my signature. I don't look at threads often. Please give me a quote not 8gp/xp for ex. I want the big number. MUST BE TRUSTED AND 100% HAND DONE
Last edited:










